During September and October 2006, our customer, Mainway Industrial Installations completed the design, fabrication and installation of a 10,000 ton (2.04 million U.S. gallon) liquid nitogen storage tank for Agrico Canada Limited on Edward Street in St. Thomas, ON.

Double R Steel was awarded the job of pre-fabricating the steel panels that make up the 48' high X 85' diameter tank.
The installation took eight weeks from start to finish.

Timing was critical to the successful completion of the project. Steel panels had to be delivered on a timely basis in order to maintain a tight assembly schedule.
Precision was critical. You can't easily bend steel panels to correct for any miscalculations without compromising the look and the integrity of the finished product.

At Double R Steel, we deliver when we say we will, regardless of the size of the project, the geographic location, or the complexity of the work.